摘要
通过确定4201综放工作面冒落带、裂隙带高度,采用5组钻孔试验顶板高位裂隙带终孔位置,对4201辅运顺槽顶板高位裂隙钻孔参数进行完善优化,使得抽采效果明显提高。
This paper through determining the 4201 mechanized working face caving zone and fractured zone height, using 5 group drilling test of roof high fracture belt end hole position, and optimize 4201 auxiliary transport along the tank roof high-level fissure drilling parameters, the drainage effect is improved obviously.
出处
《科技创新与生产力》
2015年第8期53-54,共2页
Sci-tech Innovation and Productivity
关键词
综放工作面
顶板高位裂隙钻孔
瓦斯抽采
fully mechanized working face
high fracture drilling
gas drainage