6CIGRE Task Force 38. 02. 08. Tools for long term dynamics[J].Electra,1995,(163):151-165.
7KOSTEREV D N,TAYLOR C W,MITTELSTADT W A. Model validation for the August 10,1996 WSCC system outage[J].IEEE Transactions on Power Systems,1999,(03):967-979.doi:10.1109/59.780909.
8de MELLO F P,FELTES J W,LASKOWSKI T F. Simulating fast and slow dynamic effects in power system[J].IEEE Computer Applications in Power,1992,(03):33-38.
9沈善德.电力系统辨识[M]北京:清华大学出版社,1993.
10JU P,HANDSCHIN E. Identifiability of load models[J].IEE Proceedings-Generation Transmission and Distribution,1997,(01):45-49.doi:10.1049/ip-gtd:19970621.