1Tang L X,Luh P B,Liu J Y,et al.Steel-making process scheduling using Lagrangian relaxation[J].International Journal of Production Research.2002,40(1):55-70.
2Xuan H,Tang L X.Scheduling a hybrid flowshop with batch production at the last stage[J].Computers and Operations Research,2007,34(9):2718-2733.
3Tang L,Liu J Y,Rong A,et al.A mathematical programming model for scheduling steelmaking continuous casting production[J].European Journal of Operational Research,2000,120(2):423-435.
4Atighehchian A.Bijari M,Tarkesh H.A novel hybrid algorithm for scheduling steel-making continuous casting production[J].Computers and Operations Research,2009,36(8):2450-2461.
5Guo D F,Li T K.Rescheduling algorithm for steelmaking-continuous casting[C]// 2007 2nd IEEE Conference on Industrial Electronics and Applications,Harbin,China,May 23-25,2007:1421-1425.
6Roy R,Adesola B A,Thornton S.Development of a knowledge model for managing schedule disturbance in steel-making[J].International Journal of Production Research,2004,42(18):3975-3994.
7Cowling P,Johansson M.Using real time information for effective dynamic scheduling[J].European Journal of Operational Research,2002,139(2):230-244.
9Chen H,Ihlow J,Lehmann C.A genetic algorithm for flexible job-shop scheduling[C]// Proceedings of International Conference on Robotics and Automation,Piscataway,NJ,USA,May 10-15,1999,2:1120-1125.
10Coello C A C,Lamont G B,Van Veldhuizen D A.Evolutionary Algorithms for Solving Multi-Objective Problems [M].2nd ed.Springer,2007.