焦化废水处理工程优化改造及运行 被引量:11

Optimized Reconstruction and Operation of Coking Wastewater Treatment Engineering
原文传递
导出
摘要 邯郸市某焦化厂配套废水处理站将原来的厌氧/缺氧/好氧(A/A/O)工艺改造为缺氧/好氧(A/O)工艺,通过合理设计工艺参数并加强管理,改造后废水处理系统运行稳定。监测结果表明,对COD平均去除率为94.7%、NH_3-N平均去除率为97.0%,出水水质达到《炼焦化学工业污染物排放标准》(GB 16171—2012)的间接排放标准。 The original anaerobic/anoxic/aerobic process (A/A/O) was converted to an anoxic/ aerobic process (A/O) in the auxiliary wastewater treatment station of a coking plant in Handan. Through the reasonable design of the process parameters and strengthening the management, the reconstructed wastewater treatment system had stable operation. The monitoring results indicated that the average removal rates of COD and NH3 - N were 94.7% and 97.0% , respectively. The effluent quality met the indirect discharge criteria specified in the Emission Standard of Pollutants for Coking Chemical Industry (GB 16171-2012).
出处 《中国给水排水》 CAS CSCD 北大核心 2015年第16期85-87,共3页 China Water & Wastewater
关键词 焦化废水 硝化反硝化 升级改造 coking wastewater nitrification and denitrification upgrading and reconstruction
  • 相关文献

参考文献7

二级参考文献74

共引文献144

同被引文献39

引证文献11

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部