孔隙砂岩地层涌水灾害注浆治理的新设备及方法研究 被引量:5

Research on new grouting equipment and method for the treatment of gushing water in porosity sandstone
原文传递
导出
摘要 为解决针对于孔隙砂岩水害注浆治理缺乏有效的针对性注浆设备和方法的问题,研制了一种针对孔隙砂岩水害治理的新型注浆设备,通过连续挤压方式在注浆过程中可以输出稳定低压和可控流量。提出了针对于孔隙砂岩注浆治理的新方法,辅以新型注浆设备可有效提高砂岩介质的可注性,保障注浆加固效果。将新型注浆设备和方法成功应用于孔隙砂岩介质模拟注浆试验,并应用活塞式注浆泵进行了对比试验。根据浆液扩散半径、扩散形状、注浆压力波动等实验结果表明,活塞式注浆泵不适用于孔隙砂岩的注浆治理,进一步验证了孔隙砂岩注浆治理的新方法以及新设备的科学性和可行性,为地下工程孔隙砂岩涌水灾害治理提供了新的思路。 In order to solve the problem of lacking effective targeted grouting equipment and methods to water disaster of the porosity sandstone, a new kind of grouting equipment for the water disaster governance in porosity sandstone was developed, which could output stable low pressure and controlled flow rate through continuous extrusion mode in the injection process. Moreover, a new method for the grouting treatment in porosity sandstone was proposed and supplemented by new grouting equipment, which could improve the injecting property of the sandstone medium, and guarantee the grouting effects effectively. The new grouting equipment and method were applied to the grouting experiment about porosity sandstone medium successfully, and compared with the piston grouting pump. The result about diffusion radius, diffusion experiments shape and grouting pressure showed that piston injection pump was not suitable for the water disas- ter governance in porosity sandstone, the equipment and method was further validated scientific and feasible, and a new way of thinking for the treatment of gushing water in porosity sandstone of underground projects was provided.
出处 《山东大学学报(工学版)》 CAS 北大核心 2015年第4期64-68,74,共6页 Journal of Shandong University(Engineering Science)
基金 国家自然科学基金资助项目(31410105131202)
关键词 突涌水灾害 孔隙砂岩 新型注浆设备 新型注浆方法 稳定低压 gushing water disaster porosity sandstone new grouting equipment new grouting method stable low pressure
  • 相关文献

参考文献13

  • 1GU Changcun, HONG Changdi. Calculation method of composite foundation sedimentation of grouting pile with cover plate under embankment load[J]. Journal of Central South University of Technology, 2008, 15(2):138-146.
  • 2H?IA H, NILSEN B. Rock mass grouting in the L?ren tunnel:case study with the main focus on the groutability and feasibility of drill parameter interpretation[J]. Rock Mechanics and Rock Engineering, 2014, 47(3):967-983.
  • 3CHUN B S, LEE Y J, CHUNG H I. Effectiveness of leakage control after application of permeation grouting to earth fill dam[J]. KSCE Journal of Civil Engineering, 2006, 10(6):405-414.
  • 4MKRTYCHAN Y S, BELUGIN V P. New piston designs for oilfield mud pumps[J]. Chemical & Petroleum Engineering, 1971, 7(10):850-852.
  • 5ZHOU Y, HUANG Z, BU Y. Simulation studies on drilling mud pump plunger seal failure under ultrahigh pressure and ultradeep conditions[J]. Engineering Failure Analysis, 2014, 45(1):142-150.
  • 6STILLE B, GUSTAFSON G. A review of the namntall tunnel project with regard to grouting performance[J]. Tunnelling & Underground Space Technology, 2010, 25(4):346-356.
  • 7NIKBAKHTAN B,AHANGARI K,RAHMANI N.Estimation of jet grouting parameters in Shahriar dam,Iran[J].Mining Science and Technology,2010,20(3):472-477. 被引量:7
  • 8STRYCZEK S, ZIAJA J. Selection of parameters for mud pumps used for HDD Systems[J]. Acta Montanistica Slovaca, 2006, 11(Special):229-235.
  • 9CHEN T L, ZHANG L Y, ZHANG D L. An FEM/VOF hybrid formulation for fracture grouting modelling[J]. Computers & Geotechnics, 2014, 58(5):14-27.
  • 10?Z?ELIK M. Foundation consolidation grouting applications in deriner dam and hydroelectric power plant (Artvin, Turkey)[J]. Bulletin of Engineering Geology and the Environment, 2014, 73(2):493-498.

二级参考文献17

  • 1Kutzner C. Grouting of Rock and Soil. Rotterdam: A A Balkema, 1996.
  • 2Xanthakos P P, Abramson L W, Bruce D A. Ground Control and Improvement. Wiley, 1994.
  • 3Kaushinger J L, Perry E B, Hankour R. Jet grouting: state of the practice. In: Proceeding ASCE Conference, Grouting, Soil Improvement and Geaosynthetics. New Orleans, 1992:169-181.
  • 4Yoshitake I, Nakagawa K, Mitsui T, Yoshikawa T, Ikeda A. An evaluation method of ground improvement by jet grouting. Tunneling and Underground Space Technology, 2004, 19: 496-497.
  • 5Covil C S, Skinner A E. Jet grouting: a review of some of the operating parameters that form the basis of the jet grouting process. In: Proceeding of Conference Organized by the Institution of Civil Engineering. London, 1992: 605-628.
  • 6Poh T Y, Wong I H. A field trial of jet grouting in marine clay. Canada Geotech Journal, 2001, 38: 338-348.
  • 7Bell F G. Engineering Treatment of Soil. London: Spon E & F N, 1993.
  • 8Bergado D T, Anderson L K, Miura N, Balasubramaniam A S. Soft Ground Improvement in Lowland and Other Environments. New York: ASCE Pub, 1996.
  • 9Warner J P E. Practical Handbook of Grouting. New York: John Wiley & sons, 2004.
  • 10Nikbakhtan B, Pourrahimian Y. The effects of jet grout- ing on slope stability at Shahriar dam, Iran. In: 1st Canada-U.S. Rock Mechanics Symposium. Vancouver, 2007: 1075-1084.

共引文献6

同被引文献69

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部