期刊文献+

三环路核电厂的抗震裕度评价 被引量:3

Seismic Margin Assessment in Three-loop NPP
下载PDF
导出
摘要 抗震裕度评价是核电厂中开展地震风险评价的方法之一。本论文采用PSA-based SMA方法对三环路核电厂进行了抗震裕度评价工作,并以福清核电厂一期工程为评价对象,通过对SMA各项技术要素,包括抗震裕度地震、地震设备清单、SSC的HCLPF值评价、SMA建模、电厂的HCLPF值评价等详细分析和评价,最终得到福清核电厂一期工程的抗震裕度评价结果。 Seismic margin assessment is one of methods for performing seismic risk assessment in nuclear power plant. Fuqing Unit 1 is chosen to use the PSA-based SMA method for seismic margin assessment in three-loop nuclear power plant in this paper. Through detailed analysis and evaluation for each technical element, including seismic margin earthquake, seismic equipment list, SSC HCLPF capacity, SMA model, and the plant HCLPF capacity, the results of seismic margin assessment for Fuqing Unit 1 is achieved.
作者 卢放 闫林
出处 《核科学与工程》 CSCD 北大核心 2015年第2期295-300,共6页 Nuclear Science and Engineering
关键词 抗震裕度评价 PSA-based SMA方法 抗震裕度地震 HCLPF值 seismic margin assessment PSA-based SMA method seismic margin earthquake HCLPF capacity
  • 相关文献

参考文献7

  • 1EPRI.A Methodology for Assessment of Nuclear Power Plant Seismic Margin(Revision 1),final report[R].EPRI NP-6041-SL,August 1991.
  • 2USNRC.Procedural and Submittal Guidance for the Individual Plant Examination of External Events(IPEEE)for Severe Accident Vulnerabilities,final report[R].NUREG-1407,June 1991.
  • 3USNRC.Policy,Technical,and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor(ALWR)Designs[R].Commission Paper SECY-93-087,April 2,1993.
  • 4USNRC.Staff Requirements Memorandom to SECY-93-087[R].July 21,1993.
  • 5USNRC.Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors[R].DC/COL-ISG-020.
  • 6ASME.Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications,New York[M].ASME/ANS RA-Sa-2009,2009.
  • 7中国核电工程有限公司.福建福清核电厂1、2号机组抗震裕度评价报告[R].2013.

同被引文献10

引证文献3

二级引证文献6