摘要
以上海市中环线浦东段(军工路越江隧道—高科中路)新建工程设计5标段为背景,介绍工程总体概况及跨越运营中的轨道交通2号线设计方案,并对基础施工过程中盾构变形影响进行了分析,为今后类似工程提供参考。
With the engineering background of the bid 5 of Shanghai mid-ring Pudong section(from Jungong Rd. Crossriver Tunnel to Mid Gaoke Rd.) new project, the project general summary and the design plan of crossing the running rail transit L2 are introduced in this paper. Meanwhile, the shield deformation influences during the foundation construction are analyzed, which will provide references to similar projects in the future.
出处
《中国市政工程》
2015年第4期61-63,共3页
China Municipal Engineering
关键词
中环线
总体设计
轨道交通
基础施工
mid-ring
general design
rail transit
foundation construction