期刊文献+

矿区路面清扫装置的结构设计 被引量:1

A Design Cleaning Device Structure of Mining Area Surface
下载PDF
导出
摘要 矿区生产与生活区的路面由于矿物粉尘颗粒积累比较严重,特别是在一些路沿及死角,采用传统的清扫装置清扫难度较大,清扫效率较低,本研究设计的清扫装置利用了平行四边形机构的结构特性,增大了清扫的有效面积而又不受路沿等路面条件限制,具有很强的针对性和适应性。实验表明清扫的效果均超过了行业标准规定。 Mining area of production and living areas of the road because the accumulation of mineral dust particles is serious, especially in some dead Angle, the traditional cleaning device of cleaning is dif- ficult, cleaning efficiency is low, this study design of cleaning device using the structure characteristic of the parallelogram mechanism, increase the effective area of cleaning and not be restricted by footpaths and other pavement conditions, have very strong pertinence and adaptability. Experiments show that the effect of cleaning more than the industry standard.
出处 《河南机电高等专科学校学报》 CAS 2015年第3期12-15,共4页 Journal of Henan Mechanical and Electrical Engineering College
关键词 矿区路面 扫路车 清扫装置 平行四边形机构 mine road sweeping machine cleaning device parallelogram mechanism
  • 相关文献

参考文献7

二级参考文献17

  • 1Australian Construction Services. Maralinga rehabilitation project phase 1 : Contaminated soil removal [R]. Department of Primary Industries and Energy, 2003.
  • 2Reynolds Electrical & Engineering Co. Land surface clean-up of plutonium at the Nevada Test Site, CONF-910981-29 [R]. U.S. Department of Energy, 1991.
  • 3Maralinga Rehabilitation Technical Advisory Committee. Maralinga rehabilitation project: Project manager's report (1994-2000) [R]. Depart -ment of Education, Science and Training, 2002.
  • 4Maralinga Rehabilitation Technical Advisory Committee. Rehabilitation of former nuclear test sites at Emu and Maralinga (Australia) 2003 [R]. Department of Education, Science and Training, 2002.
  • 5Information Research and Analysis Nevada Applied Ecology Information Center. Nevada Test Site environmental management end state vision, DOE/NV-958[R]. U.S. Department of Energy, 1995.
  • 6Nevada Operations Office. Development of site specific soil cleanup criteria. ANL-OHS/HP -83-200 [R]. U.S. Department of Energy, 1991.
  • 7Nevada Operations Office. Evaluation of technologies for volume reduction of plutonium-contaminated soils form the Nevada Test Site, DOE/NV/10845-57[R]. U.S. Department of Energy, 1998.
  • 8Maralinga Rehabilitation Technical Advisory Committee. Maralinga rehabilitation project phase 1 : Operational plant modifications[R]. Department of Primary Industries and Energy, 2003.
  • 9Maralinga Rehabilitation Technical Advisory Committee. Maralinga rehabilitation project phase 1: Plant modifications design review [R]. Department of Primary Industries and Energy, 2003.
  • 10夏立江,华珞,李向东.重金属污染生物修复机制及研究进展[J].核农学报,1998,12(1):59-64. 被引量:84

共引文献29

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部