摘要
以上海市徐汇区规划一路(银都路-华展路)道路新建工程2标系杆拱桥为例,介绍了系杆拱桥中横梁的安装方法,并进行受力分析和计算,提出施工要点和注意事项,为同类工程提供参考。
The tied arch bridge of new road bid 2 of planning road I (Yindu Road to Huazhan Road) in Xuhui District of Shanghai was taken as an example to introduce the installation method of beam of tied arch bridge. Forces on the beam of tied arch bridge were analyzed and calculated, and relevant key points and importance were proposed, providing references for similar projects.
出处
《建筑技术开发》
2015年第8期53-55,共3页
Building Technology Development
关键词
系杆拱桥
中横梁
安装
tied arch bridge
middle beam
installation