摘要
某热水供热管道穿越河流工程,工作钢管公称直径为1 000 mm,供热管道顶管穿越两侧堤岸,开挖河床直埋敷设。对穿越堤岸方案、围堰导流系统设计的关键内容进行了分析。
In a hot water heating pipeline crossing river project, the nominal diameter of working pipe is 1 000 mm, both banks of the river are crossed by pipe jacking, and the river bed is exc, avated for directly buried installation of the heating pipeline. The key contents in the crossing riverbank scheme and the design of cofferdam diversion system are analyzed.
出处
《煤气与热力》
2015年第8期5-7,共3页
Gas & Heat
关键词
热水供热管道
穿越河流
围堰导流
上游水位雍高
hot water heating pipeline
crossing river
cofferdam diversion
upstream water level rising