分析某CNG常规加气站压缩机回收系统原有工艺流程存在的问题,提出将回收罐与缓冲罐之间的止回阀改为调压器的改造方案,对调压器进行选型计算。
The problems existing in the original process of the compressor recovery system in a CNG conventional refueling station are analyzed. The reconstruction scheme of changing the check valve between recovery tank and buffer tank into regulator is put forward, and the type selection calculation of regulator is performed.