港珠澳大桥江海直达船航道桥钢索塔Z0节段安装技术

Installation Technology of Z0 Segment of Steel Pylon of Sea-river Ship Channel Bridge of the HZMB
下载PDF
导出
摘要 港珠澳大桥江海直达船航道桥主塔钢索塔Z0节段高3.45m,重达489t。Z0节段在安装就位过程中需穿过74根锚固螺杆,安装定位精度要求高、难度较大。施工采用大型浮吊整体吊装就位和三维精确调位工艺,确保了Z0节段的安装质量。 Segment Z0 of main tower steel pylon of Sea-river Ship Channel Bridge of HZMB is as high as 3.45m with a weight of 489T. During the installation of Segment Z0, 74 anchor screw bars shall be inserted, which require high positioning accuracy and difficulties. Overall erection by a large floating crane and three-dimensional accurate adjusting process have been adopted to ensure the installation quality of segment Z0.
出处 《广东公路交通》 2015年第4期31-35,共5页 Guangdong Highway Communications
关键词 港珠澳大桥 航道桥 钢索塔 Z0节段 安装施工 Hong Kong-Zhuhai-Macao Bridge (HZMB) Channel Bridge steel pylon Z0 segment installation
  • 相关文献

参考文献2

  • 1港珠澳大桥主体桥梁工程DB01标段施工图设计[R].北京:中交规划设计院,2012.
  • 2钢结构设计规范.GB50017-2003[S].北京:中国计划出版社,2003.

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部