摘要
分析装矿楼中影响放料的原因,从管理和设备上进行整改,制定相应的对策措施,大幅提高了提升溜槽的使用可靠性。
This paper analyzes the reason which influences the emptying of ore, rectifies and reforms it from management and equipment, and formulates the appropriate countermeasures. In these ways to increase the application reliability of the lifting chute substantially.
出处
《港口装卸》
2015年第4期56-57,共2页
Port Operation
关键词
装车楼
提升溜槽
改造
the loading building
lifting chute
transformation