风力发电机基础施工工艺及质量控制

On the Foundation Construction Process and Quality Control of Wwind Turbine
下载PDF
导出
摘要 中国风力发电机产业正飞速发展,其基本理论、技术设计、实施过程等方面亦应当与时俱进。针对风力发电机基础施工工艺进行详尽阐述,结合实例,深入研究相关质量控制方面的问题并加以科学分析,提出相应解决措施。 Chinese wind turbine industry is developing rapidly, its basic theory, technical design, implementation and other aspects should also keep pace with the times. This paper elaborated foundation construction process of wind turbine, researched issues related to quality control and made scientific analysis, finally put forward the measures to solve these problems combined with the instance.
出处 《能源与节能》 2015年第8期59-60,共2页 Energy and Energy Conservation
关键词 风力发电机 基础施工工艺 质量控制 wind turbine foundation construction process quality control
  • 相关文献

参考文献3

二级参考文献12

  • 1Jangamshetti Suresh H, Rau V. Optimum siting of wind turbine generators[ J ]. IEEE trans on Energy Conversion, 2001, 16(1) : 8 - 13.
  • 2Jangamshetti S H, Rau V G. Site matching of wind turbine generators : a case study[ J ]. IEEE Trans on Energy Conversion, 1999, 14(4) : 1537 - 1543.
  • 3Blanchard M, Desrochers G. Generation of autocorrelated wind speeds for wind energy conversion system studies[ J ]. Solar Energy, 1984,33(6) : 571 - 579.
  • 4Feijoo A E, Cidras J, Domelas J L G. Wind speed simulation in wind farms for steady-state security assessment of electrical power systems[ J ]. IEEE Transactions on Energy Conversion, 1999, 14(4) : 1582 - 1588.
  • 5Jusms C G, Hargraves W R, Mikhail A et al. Methods for Estimating Wind Speed Frequency Distributions[ J ]. Journal of Applied Meteorology, 1978, 17(3) : 350 - 353.
  • 6马振华.概率统计与随机过程卷[M].北京:清华大学出版社,2000..
  • 7王能超.数值分析简明教程[M].北京:高等教育出版社,2001..
  • 8李自应,王明,陈二永,顾本文.云南风能可开发地区风速的韦布尔分布参数及风能特征值研究[J].太阳能学报,1998,19(3):248-253. 被引量:44
  • 9吴学光,陈树勇,戴慧珠.最小误差逼近算法在风电场风能资源特性分析中的应用[J].电网技术,1998,22(7):69-70. 被引量:32
  • 10陈树勇,戴慧珠,白晓民,周孝信.风电场的发电可靠性模型及其应用[J].中国电机工程学报,2000,20(3):26-29. 被引量:233

共引文献220

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部