摘要
为了保证高炉生产稳定顺行,降低高炉炼铁成本,天钢高炉3 200 m3使用捣鼓焦代替部分顶装焦进行高炉冶炼,焦炭的质量得到改善,达到了较高的生产技术指标,降低了炼焦生产配煤成本和生铁成本,取得了显著的经济效益。
In order to ensure coke was utilized to substitute BF stable and smooth operation and pa^ial top charged coke for smelting lower the cost of iron-making, tamped at Tiangang 3 200 m3 BF. good results earned include improving coke quality, reaching high technical indices, lowering coal blending cost and pig iron cost in coking production and gaining prominent economic effect
出处
《天津冶金》
CAS
2015年第B08期9-11,共3页
Tianjin Metallurgy
关键词
捣固焦
高炉
应用
tamped coke
blast furnace
application