期刊文献+

ENGLISH ABSTRACTS OF MAIN ARTICLES IN THIS ISSUE

ENGLISH ABSTRACTS OF MAIN ARTICLES IN THIS ISSUE
下载PDF
导出
摘要 Application of Analytical Method in Error Prediction of Horizontal Important Direction Underground Tunnel Through Measurement—In error prediction of underground tunnel through measurement,the graphic method was used to measure interrelated parameter values(Rx,Ry,Lx,Ly,lcos2α,and lsin2α)of the horizontal important direction underground tunnel through,then position error of tunnel through meeting point was obtained Application of Analytical Method in Error Prediction of Horizontal Important Direction Underground Tunnel Through Measurement--In error prediction of underground tunnel through measurement, the graphic method was used to measure interrelated parameter values (Rx, Ry, Lx, Ly, lcos2ct, and lsin2a) of the horizontal important direction underground tunnel through, then position error of tunnel through meeting point was obtained in horizontal important direction. There are two problems using this approach to get parameter values: one was the tedious measure work, a^other was difficult. For the above reasons, in the paper,
出处 《矿山测量》 2015年第4期I0002-I0002,共1页 Mine Surveying

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部