铜绿山矿山地质环境治理工程中CBS基材生态防护施工坡面由于岩石裸露陡峭,复绿施工难度极大,施工单位成立项目QC小组科学合理地制定、实施优化方案,通过PDCA循环提高自检合格率至100%,完成课题目标。
The ecological protection and construction of the CBS substrate in the geological environment of the mine geological environment treatment project is very difficult because of the rock exposed and steep. Construction units set up the project QC group, scientifically and rationally implement optimization of implementing scheme. Through the PDCA cycle to improve the qualified rate of self-checking to 100% ,the authors completed scientific task.