摘要 铜绿山矿山地质环境治理工程中CBS基材生态防护施工坡面由于岩石裸露陡峭,复绿施工难度极大,施工单位成立项目QC小组科学合理地制定、实施优化方案,通过PDCA循环提高自检合格率至100%,完成课题目标。 The ecological protection and construction of the CBS substrate in the geological environment of the mine geological environment treatment project is very difficult because of the rock exposed and steep. Construction units set up the project QC group, scientifically and rationally implement optimization of implementing scheme. Through the PDCA cycle to improve the qualified rate of self-checking to 100% ,the authors completed scientific task.
出处 《资源环境与工程》 2015年第4期459-463,共5页 Resources Environment & Engineering
关键词 QC小组 CBS基材生态防护施工 自检合格率 QC group ecological protection construction of CBS substrate qualified rate of self-checking
  • 相关文献

参考文献3

  • 1湖北省国土资源厅地质环境处.湖北省矿山地质环境治理工程竣工验收实施细则(试行)[EB/OL].[2011—12—29].http://www.hblr.gov.coJwzlm/hygl/dzhjst/5181.htm.
  • 2戴方喜,刘高鹏,宋玲,等.黄石市废弃矿山生态修复之技术建议--以劳教所四大队所采石场为例[c]//中国水土保持学会.全国水土保持生态修复学术研讨会论文集.北京:中国水利水电出版社,2009.
  • 3汤明伟,孙坤,张红伟,等.论电力企业QC小组活动[J/OL].城市建设理论研究(电子版),2012(25).[2012-12-18].http://d.wanfangdata.com/Periodical_csjsllyj201225153.aspx.