1Bowman E H.Production scheduling by the transportation method of linear programming[J].Operations Research,1956,4(1):100-103.
2Manne A S.Programming of economic lot sizes[J].Management Science,1958,4(2):115-135.
3Wagner H M,Whitin T M.A dynamic version of the economic lot size model[J].Management Science,1958,5(1):89-96.
4Newhart D D,Stott K L,Vasko F J.Consolidating product sizes to minimize inventory levels for a multi-stage production and distribution system[J].J Opl Res Soc,1993,44(7):637-644.
5Chiang C,Gutierrez G J.A periodic review inventory system with two supply modes[J].Eur J Opl Res,1996,94:527-547.
6Hoshino K.Criterion for choosing ordering policies between fixed-size and fixed-interval,pull-type and push-type[J].Int J Prod Econ,1996,44:91-95.
7Ishii K,Imori S.A production ordering system for two-item,two-stage,capacity-constraint production and inventory model[J].Int J Prod Econ,1996,44:119-128.
8Luh P B,Zhou X H,Tomastik R N.An effective method to reduce inventory in job shops[J].IEEE Transactions on Robotics and Automation,2000,16(4):420-424.
9Luh P B,Hoitomt D J,Pattipati K R.Schedule generation and reconfiguration for parallel machines[J].IEEE Transactions on Robotics & Automation,1990,6(6):687-696.
10Tang L X,Luh P B,Liu J Y,et al.Steel-making process scheduling using Lagrangian relaxation[J].Int J Prod Res,2002,40(1):55-70.