摘要
六安市赤壁路桥主桥是一座矮塔斜拉桥,其为景观桥梁,外倾桥塔造型优美。介绍该桥主桥墩塔梁固结体系的选择原因、主要结构的设计细节,并采用有限元软件模拟计算施工过程和成桥运营状态的受力情况。
Main bridge of Chibi Road Bridge in Liu′an City is a low tower cable-stayed landscape bridge with extraverted tower in beautiful modeling. This paper introduces the reasons for selection of fixed pier-tower-beam system and design details of main structures of main bridge, and simulates and calculates the forces during construction and the finished bridge in operating state by means of finite element software.
出处
《公路交通技术》
2015年第4期95-99,共5页
Technology of Highway and Transport
关键词
矮塔斜拉桥
桥塔外倾
墩塔梁固结
low tower cable-stayed bridge
extraversion of bridge tower
fixed pier-tower-beam