沈阳(王家沟)至铁岭(杏山)段高速公路籍家岭右侧边坡滑塌分析及处理方案 被引量:1

Analysis and Treatment Programs of Right Side Slope Slumping of Shenyang(Wangjiagou) to Tieling(Xinshan) Highway
下载PDF
导出
摘要 籍家岭边坡位于沈铁高速公路K819+180-K819+920右侧,为最大挖深30.5m的六级挖方边坡,原状为浆砌片石全断面防护。沈四改扩建施工图设计维持此边坡现状不动,但在改扩建施工期间此边坡发生了小范围的滑塌,结合此次高速公路整体改扩建,对此边坡的整体稳定性进行分析并提出合理、经济和可行的处理方案。 Jijialing slope located at the right side of Shenyang- Tieling highway K819 + 180 - K819 + 920,is an six excavation slope with the maximum dredging depth 30. 5m. Its original state is mortar rubble full- face protection. Shensi reconstruction and expansion construction drawing design maintains current slope status,but small- scale slumping occurred during the reconstruction and expansion. Combining with the whole reconstruction and expansion of this highway,the overall stability of the slope has been analyzed and reasonable,economical and viable treatment has been proposed.
作者 禹宁
出处 《北方交通》 2015年第8期62-65,共4页 Northern Communications
关键词 边坡滑塌 锚杆框架 全风化泥岩 截水沟 Slope slump Anchor beam Completely weathered mudstone Catchwater
  • 相关文献

参考文献1

  • 1中华人民共和国交通部.JTGD20-2006公路路线设计规范[s].北京:人民交通出版社,2006.

共引文献30

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部