先张法预应力钢绞线锚固长度试验研究 被引量:9

Experimental study on anchorage length of pretensioned prestressing steel strand
原文传递
导出
摘要 为研究疲劳荷载作用下先张法预应力钢绞线的锚固长度,对3根梁式锚固试件进行了疲劳荷载作用下的疲劳试验。根据疲劳后静载试验时钢绞线的应力-应变和粘结应力,分析了钢绞线的粘结锚固机理;对比中国规范、美国规范和欧洲规范中钢绞线锚固长度得出,中国规范中钢铰线的锚固长度具有较大的安全储备,且大于美国规范和欧洲规范中钢绞线的锚固长度。 To study the anchorage length of the pretensioned prestressing steel strand under the fatigue load, fatigue tests were carried out on 3 beam-type anchorage specimens. According to the stress-strain and bond stress of the steel obtained in the post-fatigue static load tests, the bonding anchorage mechanism of the steel strand was analyzed. The comparisons of the anchorage length of the steel strand in Chinese, European and American standards were progressed, and results show that the anchorage length of the steel strand in Chinese standards is the longest with large safety reserve.
出处 《建筑结构》 CSCD 北大核心 2015年第15期102-105,92,共5页 Building Structure
基金 国家自然科学基金资助项目(50578148) 河南省交通厅资助项目(2005P338)
关键词 预应力 锚固 拉拔试验 钢绞线 滑移 prestress anchorage pull-out experiment steel strand slip
  • 相关文献

参考文献11

二级参考文献38

共引文献588

同被引文献48

引证文献9

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部