期刊文献+

基于关键路径的工作流时间异常处理算法 被引量:3

A Critical-Path-Based Approach to Handling Time Exceptions in Workflows
下载PDF
导出
摘要 为了更好地管理业务流程中的时间异常,定义了时间异常系数,描述了不同时间约束异常之间的相互影响,并提出一种基于关键路径的工作流时间异常处理方法。在实例执行阶段,实时监控每个节点的状态,当出现时间约束违反时,根据异常系数决定是否触发异常处理程序以及如何处理。该方法能够在某一时间异常发生后,预测可能出现的关联时间异常并排除,确保工作流实例状态的一致性。 To better manage the time exceptions in business process,time exception coefficient is defined and the inter-action among the different time constraints exceptions are described.Then a noveI approach based on the criticaI path is proposed for handling time exceptions.In run time,if a time constraint is vioIated,the approach is abIe to determine whether to trigger the exception handIer and how to deaI with according to the situations.This approach can predict correlative time exceptions due to some time constraints vioIation and eIiminate them to regain a consistent state of the workfIow instance.
作者 冯复剑
出处 《工业控制计算机》 2015年第7期128-129,共2页 Industrial Control Computer
关键词 工作流 时间异常 关键路径 workflow time exception critical path
  • 相关文献

参考文献5

  • 1李慧芳,范玉顺.工作流系统时间管理[J].软件学报,2002,13(8):1552-1558. 被引量:48
  • 2EDER J, PANAGOS E, RABINOVICH M. Time Constraints in Workflow Systems [C]//Proc of the 11th International Conference on Advanced Information Systems Engineering, 1999: 286-300.
  • 3NICULAE C. Time Patterns in Workflow Management Systems [R]. BPM-11-04. BPM Center Report, BPMcenter.org, 2011.
  • 4李慧芳,冯复剑.时间约束工作流的截止期限管理及其动态监控[J].北京理工大学学报,2011,31(8):937-943. 被引量:5
  • 5S0N J, KIM M.Finding the critical path in a time-constrained workflow[C]//Proc of the 7th International Conference on Real-Time Systems and Applications, 2000:102-107.

二级参考文献15

  • 1唐达,刘丹妮.一种工作流时间截止期限的动态验证方法[J].计算机集成制造系统,2004,10(9):1154-1159. 被引量:8
  • 2陶泽,谢里阳,袁锋.受时间约束的工作流关键路径的确定[J].计算机工程与应用,2004,40(29):21-23. 被引量:7
  • 3范玉顺.工作流管理技术基础--实现企业业务过程重组.过程管理与业务过程自动化的核心技术[M].北京:清华大学出版社/施普林格出版社,2001.110-169.
  • 4Li Weiping, Fan Yushun. A time management method in workflow management system [C]//Proceedings of 2009 Workshops at the Grid and Pervasive Computing Conference. Geneva, Switzerland: Springer Verlag, 2009:3 - 10.
  • 5Son J H, Kim M H. Finding the critical path in a time- constrained workflow[C]. // Proceedings of the Seventh International Conference on Real-Time Systems and Applications. Cheju Island, South Korea: IEEE Comput Soc, 2000:102 - 107.
  • 6Son J H, Kim J H, Kim M H. Deadline allocation in a time-constrained workflow[J]. International Journal of Cooperative Information Systems, 2001, 10 ( 4 ): 509 -530.
  • 7Son J H, Kim J H, Kim M H. An effective static deadline assignment method in workflow systems[C]// Proceedings of the Fifth Joint Conference on Information Sciences. Atlantic, USA: Duke University, 2000: 433 - 436.
  • 8石祥滨,高扬,鲜宏.一种工作流时间约束的动态验证方法[J].小型微型计算机系统,2008,29(12):2268-2271. 被引量:4
  • 9史美林,杨光信,向勇,伍尚广.WfMS:工作流管理系统[J].计算机学报,1999,22(3):325-334. 被引量:291
  • 10王海洋,林宗楷,林守勋.基于扩展模型的工作流描述方法和最大时间控制问题[J].计算机辅助设计与图形学学报,1999,11(3):253-255. 被引量:10

共引文献50

同被引文献21

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部