摘要
上海大中里项目工程的多个塔楼、裙房基坑紧邻地铁13号线在建车站及2号线地铁区间隧道,因其地处市商业中心,施工条件复杂,对变形控制要求高。为了确保13号线车站的如期建成及2号线隧道的稳定和正常运营,在其深基坑施工筹划中,通过对施工方案精密研究、技术路线的合理优化,最终顺利地完成了项目的建设开发及保护任务。
Shanghai Dazhongli development project is situated in town centre surrounded by existing buildings, one operating Line 2 metro and main trunk roads. It is complex for construction of multi-towers on a single podium and basement merged with a new Line 13 metro station. In order to limit the deformation to protect the surrounding amenities, a sophisticated construction planning has been done and executed. So, the construction and protection was done successfully.
出处
《施工技术》
CAS
北大核心
2015年第14期108-111,115,共5页
Construction Technology
关键词
地下工程
深基坑
地铁
施工技术
underground
deep foundation excavation
subways
construction