摘要
随着我国铁路工程建设的不断发展,与铁路运营相关的既有线改造工程等,由于工程专业性强,施工难度大,安全风险高,施工单位往往存在技改方案编制不合理,无法顺利通过审批;技术控制要点遗漏,出现数据错误引起返工等不利情况,制订一套切实可行、符合运营要求的方案是关键。文章结合工程实际情况,总结出了既有线站改工程技术控制要点和方案编制思路,旨在实现施工方案和技术控制符合运营要求,并为广大既有线站改工程技术人员提供参考。
With the continuous development of railway engineering construction in our country,and railway operations related to the transformation of existing projects,becanse of the strong professional engineering,construction difficult,high security risk, construction units often exist in the technological transformation plan is reasonable to smoothly through the examination and approval,control technology missing points, appear data errors caused by rework adverse situation,formulate a set of feasible,conformed to the requirements of the operation plan is the key.In combination with engineering practice, summed up the existing station engineering change the control points and programming ideas, aims to achieve the construction scheme and technical control in accordance with operation, and the majority of existing railway station engineering and technical personnel to provide the reference.
出处
《企业技术开发》
2015年第7期35-39,63,共6页
Technological Development of Enterprise
关键词
既有线
站场改造
技术控制
方案
existing lines
station renovation
technical control
program