摘要
文章结合广州市北部水系建设引水干渠工程,介绍了大口径顶管施工中顶管机的选型、施工流程、施工关键参数的计算、施工中遇到的问题以及解决办法等,为相关工程的施工提供参考和借鉴。
In combination with Guangzhou northern water system construction diversion canal project,and introduces the problems encountered in the calculation of large diameter pipe jacking in pipe jacking machine selection, construction process, construction of key parameters and construction, as well as the solutions to problems, in order to provide reference for engineering construction.
出处
《企业技术开发》
2015年第7期85-87,共3页
Technological Development of Enterprise
关键词
大口径
顶管施工
泥水平衡
技术措施
the large diameter
pipe jacking construction
slurry balance
technical measures