摘要
苏州市北环快速路西延工程全长约7.7 km,其中高架桥长约7.2 km,相交道路长江路设置下穿通道。介绍高架桥梁的总体布置、技术标准、设计要点以及下穿通道的设计特点。
The total length of Suzhou City North Ring Expressway West Extension Project is about 7.7 km, in which the viaduct is about 7.2 km long and intersected with the road- Changjiang Road has a tunnel. This paper introduces the overall layout, technical standard, design gist and the design features of the tunnel of elevated bridge.
出处
《城市道桥与防洪》
2015年第8期50-52,共3页
Urban Roads Bridges & Flood Control
关键词
高架桥
箱梁
下穿通道
总体设计
elevated bridge,box beam,tunnel,overall design