摘要 在城市繁华街区利用矩形顶管法施工地下过街通道,较之传统地面开挖工艺在管线保护、交通维持等方面有较大的优势,因此应用越来越广泛。一些工程存在用地限制、管线保护难度大等特殊工况,矩形顶管施工需要采取针对性措施。文章介绍了上海轨道交通10号线伊犁路站工程3号出入口矩形顶管法施工采取特定措施克服了区域电力排管箱涵保护难度大、38°大角度斜交进洞、2.3 m净宽小接收井需两次土中进洞等施工难题,对方案实施全过程进行剖析,总结了以上诸多措施实施效果,为类似工程施工提供参考。 Compared with the traditional ground excavation technology, the rectangular pipe jacking method has the greater superiority to construct the underpass in the pipeline protection, traffic maintenance and etc.Therefore, its application is more widely. The rectangular pipe jacking construction is required to take the targeted measures because of the land limit, pipeline protection difficulty and special construction conditions existing in some projects. The article introduces the specified measures taken to overcome the construction difficulties in the protection of regional power pipe box culvert, skewing into hole of the large 380 angle and2.3-m clear width of small receiving well required into the hole in the soil twice. The paper analyzes the whole process of the scheme implementation, and summarizes the implementation effects of many above measures, which can be referenced for the similar projects.
作者 陶涛
出处 《城市道桥与防洪》 2015年第8期150-153,共4页 Urban Roads Bridges & Flood Control
关键词 矩形顶管施工 大角度斜交进洞 小接收井二次进洞 rectangular pipe jacking construction,large angle skewing into hole,small receiving well skewing into hole twice
  • 相关文献

同被引文献28

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部