摘要
以某热电厂410t/h燃煤锅炉的冷风加热系统为例,分别阐述了暖风器系统、热风再循环系统和烟气余热回收加热系统的工艺方案,并找出了最优方案。
The process programs of the air heater system,hot air recirculation system and flue gas waster heat recovery system in the heating cool wind system of a 410 t/h coal fired boiler were discussed and the optimal program was found out.
出处
《石化技术》
CAS
2015年第8期269-270,共2页
Petrochemical Industry Technology
关键词
锅炉
暖风器
烟气余热回收
相变换热器
经济性
boiler
air heater
flue gas waster heat recovery
phase change heat exchange
economical efficiency