水电工程移民前期设计工作管理探讨 被引量:1

Discussion on Preliminary Design Management of Hydropower Project Resettlement
下载PDF
导出
摘要 目前水电工程移民前期设计工作中存在许多问题和困难。为了有效有序开展水电工程移民前期设计工作,顺利推进水电工程建设,针对这些问题提出了一些建议,探讨了移民政策平衡、工作组织形式和程序、"封库令"的有效期、移民工程建设标准和规模的确定、移民工程前期设计深度、移民意愿调查结果和安置方案吻合度等。 There are many problems and difficulties on preliminary design of hydropower project resettlement at present. In order to conduct the preliminary design of resettlement effectively and orderly and to promote the construction of hydropower projects smoothly, a lot of suggestions are proposed, such as the balance of resettlement policies, the organization and procedures of preliminary design, the validity of Stop-construction Notice, the determination of resettlement construction standards and scale, the preliminary design degree of resettlement projects, and the consistent degree of resettlement willing investigation and relocation programs.
出处 《水力发电》 北大核心 2015年第9期8-10,18,共4页 Water Power
关键词 移民前期设计 工作管理 水电工程 preliminary design of resettlement management hydropower project
  • 相关文献

参考文献7

二级参考文献34

共引文献64

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部