在移民工程安置点建设过程中,由于所处场地位置的特殊性,场地地基经常需要进行回填处理,回填场地后期的沉降是影响场地使用的主要问题,也是决定场地上部建构筑物结构能否正常运行的关键因素之一。因此,合理地选用地基回填处理方式尤为重要,是场地回填处理的一个关键质量控制要点。
In the process of resettlement site construction, the ground foundation often needs to be treated with backfill due to the special nature of the site location. The backfill settlement in late stage is a main problem that affects the use of site, and is also one of the key factors to determine whether the building structure can be normally operated. Therefore, the reasonable selection of foundation treatment method is particularly important and is a key quality control point of ground backfill process.