沙坪二级水电站工程“先移民后建设”探索与实践 被引量:3

Exploration and Practice of “Project Construction after Resettlement” Policy in the Construction of Shaping Ⅱ Hydropower Station Project
下载PDF
导出
摘要 水电工程开发"先移民后建设"新方针立足于当前水电开发建设实际,能更好地确保移民群众的合法群益和工程建设的顺利进行,是一项高度重视移民工作的新举措。这项举措要求移民安置工作进度优先于工程建设进度,能有效解决移民安置滞后影响水电工程建设的问题,实现移民安置与水电工程建设的双赢。大渡河沙坪二级水电站作为四川省较早试行"先移民后建设"工作的电站之一,对贯彻该方针进行了探索和实践,并积累了宝贵经验。 The policy of "Project Construction after Resettlement" is formulated based on current hydropower development and construction practice in China. This policy requires the resettlement being completed before construction progress. It can protect resettlement's legal rights, ensure the smooth construction of project, effectively solve the problem of project construction being affected by the delay of resettlement and achieve win-win situation between resettlement and project construction. The Shaping II Hydropower Station in Dadu River in Sichuan Province is one of earlier pilot project implementing the policy. The exploration and practice of Shaping II Hydropower Station has accumulated valuable experiences.
作者 陈森 吴兵兵
出处 《水力发电》 北大核心 2015年第9期67-70,共4页 Water Power
关键词 水电工程 移民安置 先移民后建设 沙坪二级水电站 hydropower project resettlement project construetion after resettlement Shaping Ⅱ Hydropower Station
  • 相关文献

参考文献7

  • 1国务院令第471号大中型水利水电工程建设征地补偿和移民安置条例[S].
  • 2发改能源[2012]293号关于做好水电工程先移民后建设工作的通知[S].
  • 3川扶贫移民规安[2010]202号关于在全省大中型水利水电工程试行先移民后建设有关问题的通知[S].
  • 4陈森,周清等.四川省大渡河沙坪二级水电站可行性研究阶段建设征地移民安置规划大纲(审定本)[R].杭州:中国水电顾问集团华东勘测设计研究院,2010.
  • 5陈森,周清等.四川省大渡河沙坪二级水电站可行性研究阶段建设征地移民安置规划(审定本)[R].杭州:中国水电顾问集团华东勘测设计研究院,2010.
  • 6吴兵兵,周清等.沙坪二级水电站工程建设区和围堰截流水位以下移民搬迁安置实施方案(审定本)[R].杭州:中国水电顾问集团华东勘测设计研究院,2011.
  • 7吴兵兵,陈森等.沙坪二级水电站"先移民后建设"移民工程项目申请报告(审定本)[R].杭州:中国水电顾问集团华东勘测设计研究院,2011.