连续梁倒拆施工倾覆稳定性的体系可靠度方法 被引量:6

System Reliability Method to Analyze Overturning Stability of Demolition Construction of Continuous Beam Bridges
下载PDF
导出
摘要 针对连续梁双悬臂挂篮逆施工顺序拆除施工的纵向倾覆稳定性,采用可靠度方法对其进行安全评价.提出因果链模式的体系可靠度方法,推导拓展了全概率公式的应用范围,并据此推导了因果链模式体系可靠度计算公式,计算结果和串并联联接模式很好吻合.推导拓展了贝叶斯公式的应用范围,分析得出导致体系失效最主要的失效模式.对最主要的失效模式进行了参数敏感性分析,得出可以指导拆除施工抗倾覆问题的结论,即吊索强度、根数和钢管桩强度以及切割不对称误差对拆除体系倾覆安全可靠度影响非常大. The overturning stability of cantilever beam bridges in demolition process was assessed by the method of reliability, the causality-chains method of system reliability was proposed, and the application of total probability formula was developed. Moreover, the system reliability formula of causality-chains was derived with the developed total probability formula, and the calculated results by the formula were found to be well anastomosed with the series parallel connection. Furthermore, the application of Bayes formula was developed, by which the most important failure mode was analyzed. The sensitivity of parameters of the most important failure mode was analyzed. It is concluded that the lifting rope strength, rope number and temporary support strength have a significant influence on the overturning stability of the demolition system.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2015年第8期1167-1173,共7页 Journal of Tongji University:Natural Science
基金 国家自然科学基金(51378383) "十一五"国家科技支撑计划(2014BAB16B05) 上海市城乡建设和交通委员会科研项目(2013-006-003)
关键词 混凝土连续梁 倒拆施工 纵向倾覆稳定性 可靠度 因果链模式 continuous concrete beam opposite sequenceddemolition longitudinal overturning stability reliability causality-chains
  • 相关文献

参考文献11

二级参考文献36

  • 1吕毅刚,张建仁,刘扬.混凝土斜拉桥悬浇施工期主梁活荷载调查与统计分析[J].中外公路,2005,25(1):38-42. 被引量:4
  • 2王勇.PC梁桥顶推施工过程的仿真分析[J].城市道桥与防洪,2006(3):55-57. 被引量:3
  • 3Richardson M G.Fundamentals of durable reinforcedconcrete[M].London:Spon Press,2002:6-35.
  • 4Okasha N M,Frangopol D M.Lifetime-oriented multi-objectiveoptimization of structural maintenance considering systemreliability,redundancy and life-cycle cost using GA[J].StructuralSafety,2009,31(6):460-474.
  • 5Okasha N M,Frangopol D M.Time-variant redundancy ofstructural systems[J].Structure and Infrastructure Engineering,2010,6(1):279-301.
  • 6Estes A C,Frangopol D M.Load rating versus reliabilityanalysis[J].Journal of Structural Engineering,2005,131(5):843-847.
  • 7Akgül F,Frangopol D M.Lifetime performance analysis ofexisting prestressed concrete bridge superstructures[J].Journalof Structural Engineering,2004,130(12):1889-1903.
  • 8Akgül F,Frangopol D M.Lifetime performance analysis ofexisting reinforced concrete bridges.Ⅰ:Theory[J].Journal ofInfrastructure Systems,2005,11(2):122-128.
  • 9Akgül F,Frangopol D M.Lifetime performance analysis ofexisting reinforced concrete bridges.Ⅱ:Application[J].Journalof Infrastructure Systems,2005,11(2):129-141.
  • 10Akgül F,Frangopol D M.Computational platform for predictinglifetime system reliability profiles for different structure types ina net work[J].Journal of Computing in Civil Engineering,2004,18(2):92-104.

共引文献138