摘要
本文分析了高速公路施工阶段质保资料整理过程存在的现状及原因,结合质保资料收集的内容,按顺利分别从工程开工申请报告、质检资料、评定资料三大部分整理过程中突出的错误性问题进行了梳理,提出防范对策。通过实践证明,提出的对策应用于高速公路施工阶段质保资料的整理过程中,可以摆脱资料滞后于工程进展及造假的问题,为后期交工资料的快速移交奠定基础,减少后期人力、物力、财力的消耗。
This paper analyzes the highway construction stage quality assurance documents finishing process and the reasons for the status quo,according to the contents of the warranty data collection,according to the smooth respectively from the project start application report and quality inspection data,evaluation data of three parts in the finishing process in prominent error problem of the sort,put forward countermeasures. Proved by practice,the countermeasures and application in highway construction stage quality assurance documents finishing process,can get rid of information lags behind the progress of the project and fraud,for late completion materials rapid transfer of lay the foundation for lower consumption of post of human,material and financial resources.
出处
《福建建筑》
2015年第8期85-86,103,共3页
Fujian Architecture & Construction
关键词
高速公路
质保资料
问题及防范对策
Highway
The quality assurance data
Problems and prevention countermeasures