期刊文献+

基于有限元法的深水钻井隔水管压溃评估 被引量:10

Collapse Assessment for Deepwater Drilling Risers on the Basis of Finite Element Method
下载PDF
导出
摘要 压溃是深水钻井隔水管主要的失效模式之一,现有的理论算法无法考虑缺陷对隔水管压溃的影响。因此,考虑磨损和腐蚀对隔水管压溃性能的影响,建立了深水钻井隔水管非线性压溃有限元评估方法,并与深水钻井隔水管压溃理论评估方法进行了对比。结果表明:有限元压溃分析方法与API RP 2RD、DNV OS F101推荐算法的分析结果基本一致,验证了隔水管压溃有限元分析方法的准确性;压溃过程的初始阶段隔水管发生弹性变形,当内外压差达到临界压力时,隔水管开始发生塑性变形,弹性阶段向塑性阶段的突变点即为隔水管压溃临界点;完好隔水管压溃后截面呈扁平状,缺损隔水管压溃后截面呈锥形;随着隔水管缺陷尺寸增大,隔水管临界压溃压力逐渐降低。 Collapse is one of the major failure modes in deepwater drilling risers.In the existing theoretical algorithm,the effects of defects on riser collapse cannot be considered.This paper describes the effects of wear and corrosion on the potential for riser collapse,sets up a method of finite element evaluation for nonlinear collapse of deepwater drilling risers,and details how the verification and analysis for the method were carried out.It showed that the analysis results of finite element stress analysis coincided well with that recommended by API RP 2RD and DNV OS F101,the accuracy of finite element analysis method for riser collapse was verified.At the initial stage of riser collapse,risers were elastically deformed.After the difference between internal and external pressures reaches a critical value,risers were plastically deformed.The point of abrupt change from elastic to plastic deformation is the critical point of riser collapse.After collapsing,the original intact risers became flat and some risers that had defects initially became cone-shaped.In addition,the critical collapse pressure of risers decreased gradually with the increase of the defect sizes of risers.
出处 《石油钻探技术》 CAS CSCD 北大核心 2015年第4期43-47,共5页 Petroleum Drilling Techniques
基金 国家重点基础研究发展计划("973"计划)项目"海洋深水油气安全高效钻完井基础研究"(编号:2015CB251200) 国家科技重大专项"深水钻井隔水管作业管理及安全评价技术"(编号:2011ZX05026-001-05)联合资助
关键词 深水钻井 隔水管 压溃 有限元法 缺陷 deepwater drilling riser collapse finite element method defect
  • 相关文献

参考文献13

  • 1张磊,畅元江,刘秀全,刘康,陈黎明.深水钻井隔水管与防喷器紧急脱离后的反冲响应分析[J].石油钻探技术,2013,41(3):25-30. 被引量:21
  • 2ISO 13624-1 Petroleum and natural gas industries:drilling and production equipment:part 1:design and operation of marine drilling riser equipment[S].
  • 3刘秀全,陈国明,彭朋,畅元江.深水钻井隔水管单根寿命管理方法[J].石油钻探技术,2011,39(2):40-44. 被引量:11
  • 4隋秀香,梁羽丰,李轶明,尹邦堂,李相方.基于多普勒测量技术的深水隔水管气侵早期监测研究[J].石油钻探技术,2014,42(5):90-94. 被引量:9
  • 5Erb P R,Ma Tien-Chi,Stockinger M P.Riser collapse:a unique problem in deep-water drilling[R].IADC/SPE 11394,1983.
  • 6Benjamin A C,Cunha D J S.Assessment of hydrostatic collapse of submarine pipelines:historical review of the classic methods:proceedings of the 2012 9th International Pipeline Conference,Calgary,September 24-28,2012[C].
  • 7Benjamin A C,Cunha D J.Assessment of hydrostatic collapse of submarine pipelines:the classical approach revisited:proceedings of the ASME 31st InternationaL Conference on Ocean,Offshore and Artic Engineering,Rio de Janeiro,July 1-6,2012[C].
  • 8Kavanagh W K,Lou J,Hays P.Design of steel risers in ultra deep water:the influence of recent code requirements on wall thickness design for 10,000ft water depth[R].OTC 15101,2003.
  • 9API BULLETIN 5C3—1994 Buttletin on formulas and calculations for casing,tubing,drill pipe and line pipe properties[S].
  • 10API RP 1111—1999 Design,construction,operation,and maintenance of offshore hydrocarbon pipelines[S].

二级参考文献33

  • 1梁从军,王本奇.测井与地质录井结合准确判断油气层[J].天然气工业,2003,23(z1):52-56. 被引量:31
  • 2李硬,薛智.多普勒超声波流量计测量中异常现象分析[J].中国仪器仪表,2004(9):41-42. 被引量:4
  • 3刘金梅,周国强,郭金玉.基于模型修正的井架评定方法[J].大庆石油学院学报,2004,28(6):48-50. 被引量:10
  • 4陈明政,黄音,王正霖,白绍良.基于弧长法的预应力框架结构非线性分析[J].华南理工大学学报(自然科学版),2006,34(7):109-114. 被引量:4
  • 5Cook H H, Dopjera D E, Thethi R, et al. Riser integrity management for deepwater developments[R]. OTC 17891,2006.
  • 6Lozev M G,Smith R W,Grimmett B B. Evaluation of methods for detecting and monitoring of corrosion damage in risers[J]. Journal of Pressure Vessel Technology, 2005,127(3) : 244-254.
  • 7DNV- RP F206 Riser integrity management[S]. Det Norske Veritas, 2008.
  • 8DNV- RP- G101 Risk based inspection of offshore topsides static mechanical equipment[S]. Det Norske Veritas, 2010.
  • 9Great Britain Health & Safety Executive. Guidelines for integrity monitoring of unbonded flexible pipe [R]. OTO 98019, 1998.
  • 10ISO 13624-1:2009 Petroleum and natural gas industriesdrilling and production equipment part 1: design and operation of marine drilling riser equipment[S].

共引文献36

同被引文献115

引证文献10

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部