长沙市万家丽路快速化改造工程桥梁设计 被引量:1

Overall Design of Wanjiali Road Express Reconstruction Project in Changsha City
下载PDF
导出
摘要 长沙市万家丽路快速化改造工程,采用高架快速路+地面快速路相结合的快速化改造方案,全线高架双向六车道,共设4对平行式匝道,一处立交,高架全线主要采用"飞雁形"斜腹板预应力混凝土连续箱梁+双柱花瓶式桥墩,立交主要采用斜腹板钢筋混凝土连续箱梁+独柱式花瓶形桥墩。 The express reconstruction scheme combined with the elevated expressway and the ground expressway is used for Wanjiali Road Express Reconstruction Project in Changsha City. The elevated double-way six-lane scheme is used in the whole line, in which 4 pairs of ramp at grade and an interchange are constructed. The whole elevated line is mainly used of 'flying goose' inclined web pre-stressed concrete continuous box girder and double-column vase-shaped pier. The interchange is mainly used of inclined web steel reinforced concrete continuous box girder and single-column vase-shaped pier.
作者 陈峭
出处 《城市道桥与防洪》 2015年第7期118-121,13,共4页 Urban Roads Bridges & Flood Control
关键词 万家丽路 高架桥 三一大道立交 预应力混凝土连续箱梁 钢-混凝土组合箱梁 花瓶墩 Wanjiali Road,elevated bridge,Sanyi Avenue Interchange,pre-stressed concrete continuous box girder,steel-concrete composite box
  • 相关文献

参考文献1

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2012.

共引文献20

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部