期刊文献+

考虑时变因素修正的混凝土斜拉桥换索前初态模型 被引量:1

Analysis model before cable replacement construction of stay cable bridge with time-dependent effects
下载PDF
导出
摘要 为准确掌握混凝土斜拉桥换索施工前的索力和主梁受力状态,建立的换索施工前的初态分析模型,需要对其运营期间混凝土收缩徐变、预应力索应力松弛、恒载性超载等因素产生的影响进行评估。而混凝土弹性模量、徐变、收缩及预应力筋松弛等因素具有与时间历程和应力历史紧密关联的材料非线性特征,采用有限元增量分析是合理的选择。为此,在时间历程划分的基础上,推导了考虑材料徐变、松弛、收缩影响的弹塑性有限元求解方程,建立了时间增量步内单元计入徐变、收缩、松弛影响的数值函数表达式,给出了斜拉索损伤刚度修正的具体措施和恒载性超载影响计入的分析方法,建立的初态模型分析技术进一步改善了混凝土斜拉桥运营期的桥梁状态评估方法。 In order to understand the cables forces and girder forces state of concrete cable-stayed bridge before the cable replacement construction,and to establish the analysis model of the bridge,the influence factors such as concrete creep shrinkage,stress relaxation of prestressing tendons,element damage,overload of dead need to be evaluated.Creep,relaxation and shrinkage are closely associated with the material nonlinearity which dependent on time and stress history so it's reasonable to adopt the finite element analysis technology based on elastic-plastic incremental load method.Based on the specified time intervals,the incremental elastic-plastic finite element equilibrium equation is deduced which includes the effect of creep,relaxation and shrinkage.For the time increment step,numeric expressions of creep,shrinkage and stress relaxation are established for beam element.Methods are proposed to analyze the influence of stay-cables damage and overload of dead.The methods will improve the structure state analysistechniques for the concrete cable-stayed bridge in service period.
出处 《土木建筑与环境工程》 CSCD 北大核心 2015年第4期45-50,共6页 Journal of Civil,Architectural & Environment Engineering
基金 国家自然科学基金(51178059)~~
关键词 桥梁工程 桥梁状态 增量分析 混凝土斜拉桥 收缩徐变 应力松弛 恒载性超载 bridge engineering bridge condition incremental load method concrete stay cable bridge creep & shrinkage stress relaxation overload of dead
  • 相关文献

参考文献13

二级参考文献26

共引文献134

同被引文献13

引证文献1

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部