大型线状生产建设项目水土保持监测“十个到位”——以新建重庆—万州铁路为例 被引量:8

Ten crucial aspects for soil and water conservation monitoring on large linear production and construction projects:A case study on the new Chongqing-Wanzhou railway
下载PDF
导出
摘要 受传统水土保持监测项目管理习惯以及监测单位管理能力等因素影响,生产建设项目水土保持监测管理存在管理粗放、制度不完善、技术手段偏低等问题。以新建重庆—万州铁路(简称"渝万铁路")水土保持监测项目为例,总结出在生产建设项目水土保持监测管理过程中必须要做到前期工作到位、办公场所到位、监测人员到位、仪器设备到位、管理制度到位、档案资料到位、沟通协调到位、监测频次到位、技术手段到位、监测成果到位等10个到位,以期为开展类似大型线状生产建设项目水土保持监测提供参考。 Affected by the traditional project management and management ability of monitoring sectors, some problems exist in the management of soil and water conservation monitoring on production and construction projects, such as extensive management, institutional dysfunction, and outdated technologies. Taking the soil and water conservation monitoring of Chongqing-Wanzhou railway as a study case, we summarize experiences in the monitoring into 10 crucial aspects that should be in place: preliminary work, office space, monitoring personnel, instruments and equipments, management system, archives information, communication and coordination, monitoring frequency, technical measures, and monitoring report, in order to provide reference of soil and water conservation monitoring for similar large linear production and construction projects.
出处 《中国水土保持科学》 CSCD 北大核心 2015年第4期114-116,共3页 Science of Soil and Water Conservation
关键词 大型线状工程 水土保持监测 项目管理 渝万铁路 large liner engineering soil and water conservation monitoring project management Chongqing-Wanzhou railway
  • 相关文献

参考文献2

二级参考文献2

  • 1姜德文 刘朝辉.开发建设项目水土流失监测[A]..全国第一届水土保持监测学术研讨会论文集[C].,2001.67-72.
  • 2.中华人民共和国水利行业标准水土保持监测技术规程[S].[S].,2002.10.

共引文献29

同被引文献39

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部