摘要
通过对大化水电站、百龙滩水电站厂内优化发电方式的分析比对,以两电站的发电用水最小、发电效益最大化为目标,提出了两电站联合调度最优发电方案。实践证明,提出的运行方式,产生良好的经济效益,其经验也可供红水河流域多个梯级电站的联合优化调度借鉴。
With the goal of minimum water use and maximum power generation benefit, an optimal joint scheduling scheme is proposed in this paper through analyzing and comparing the optimized power generation schemes of Dahua and Bailongtan hydropower stations. The practice shows that the joint scheduling scheme gets better economic benefit and it can be well referenced by the cascade stations in Hongshui River Basin.
出处
《红水河》
2015年第4期1-4,共4页
Hongshui River
基金
广西桂冠电力股份有限公司大化水力发电总厂厂控科技项目
关键词
梯级水库
优化调度
大化水电站
百龙滩水电站
cascade reservoirs
optimal scheduling
Dahua hydropower station
Bailongtan hydropower station