地铁盾构隧道贯通测量误差的控制与实施 被引量:6

Discussion on Control and Implementation of Breakthrough Survey Error in Metro Shield Tunnels
下载PDF
导出
摘要 地铁盾构贯通测量中的横向贯通误差精度的控制是地铁施工测量中的难点,以某市地铁1号线一期工程某区间为例,通过对贯通测量误差分配、横向贯通精度影响值估算的分析与研究,总结了对于不同长度地铁隧道盾构工程的贯通测量实施方案,并提出了一些建议。 The control of lateral breakthrough error is a difficult problem in metro construction survey. Taking a section in the Metro Line #1's first phase project of a certain city for an example,error distribution and accuracy estimation of breakthrough survey was analyzed,and then different implementing schemes in various lengths of metro tunnel shield projects summarized. Some suggestions on metro shield tunnels breakthrough survey were finally proposed,providing technical and practical experience for the further metro construction survey as reference.
出处 《城市勘测》 2015年第4期138-140,151,共4页 Urban Geotechnical Investigation & Surveying
关键词 贯通测量 横向贯通误差 地下控制网 陀螺定向边 单导线法 breakthrough survey lateral breakthrough error underground control network gyro-orientational line single orientation traverse method
  • 相关文献

参考文献8

二级参考文献26

共引文献569

同被引文献22

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部