摘要 港珠澳大桥遂道工程是目前世界上外海条件下埋深最深的沉管隧道工程,该沉管隧道断面大、管节质量大、混凝土抗裂要求高,在国内首次采用了工厂化预制工艺进行沉管管节的预制。由于预制工艺复杂,项目前期进行了深入的研究,并进行了众多工艺的改进和创新。介绍了工厂法预制的工艺及关键技术和应用情况。 Hong Kong-Zhuhai-Macao Bridge project is the deepest buried depth of immersed tunnel in the open sea. The tubes in this project have large cross sections, heavy weight, and high standard of crack resistance of concrete. It is the first one using industrial prefabricated immersed tubes for tunnel construction in China. Due to complexities of the prefabrication technology, deep studies were made to develop various improvements and innovations. This paper mainly outlines the industrial prefabrication technology and its application.
出处 《水运工程》 北大核心 2015年第8期1-5,共5页 Port & Waterway Engineering
关键词 沉管隧道 沉管预制 工厂法预制 immersed tunnel prefabrication of immersed tunnel elements industrial prefabrication
  • 相关文献

参考文献4

  • 1Busby J, Marshall C. Design and cnns|ruclinn of tile Oresund tunnel[C]. Proceedings of the Institution of Civil Engineers. Civil Engineering, 2000: 157-166.
  • 2W Jassen, P de, Haas, Y H Yoon. Busan-Geoje Link: hnmersed tunnel opening horizons [J]. Tunnelling and Underground Space Technology, 2006(3) : 332.
  • 3肖晓春.大型沉管隧道管节工厂化预制关键技术[J].隧道建设,2011,31(6):701-705. 被引量:20
  • 4翟世鸿.港珠澳大桥沉管工厂化预制研究报告[R].武汉:中交第二航务工程局有限公司,2010.

二级参考文献9

  • 1管敏鑫.钢筋混凝土沉管隧道在设计与施工中的有关问题[J].现代隧道技术,2007,44(1):1-4. 被引量:5
  • 2ITA Work Group. Immersed and floating tunnels [ J ]. Tun- nelling and Underground Space Technology, 1997,12 (2): 93 - 109.
  • 3The Oresund techinical publication. Tunnel [ M ]. Oresunds- bro Konsortiet, 2001.
  • 4Chris Marshall. The Oresund tunnel: Making a success of design and build [ J ]. Tunnelling and Underground Space Technology, 1999,14(3) :355 - 365.
  • 5W P S Janssen, Steen Lykke. The fixed link across the Ore- sund: Tunnel section under the Drogden [ J ]. Tunnelling and Underground Space Technology," 1997,12( 1 ) :5 - 14.
  • 6W Jassen, P de Haas, Y H Yoon. Busan-Geoje Link: Im- mersed tunnel opening horizons [ J ]. Tunnelling and Under- ground Space Technology,2006,21 (3) : 332.
  • 7L C F Ingerslev. Considerations and strategies behind the design and construction requirements of the Istanbul Strait immersed tunnel [ J ]. Tunnelling and Underground Space Technology, 2005,20 (6) : 604 - 608.
  • 8杨文武.沉管隧道工程技术的发展[J].隧道建设,2009,29(4):397-404. 被引量:36
  • 9王兴铎.水下沉管隧道的发展及施工技术[J].中国铁路,2001(5):48-50. 被引量:13