无锚板桩+支撑墩码头结构在强涌浪海域块石覆盖层条件下的应用 被引量:2

Application of unanchored sheet pile & supporting pillar structure in strong swell sea and rock overburden
下载PDF
导出
摘要 以色列阿什杜德港项目所处环境地质条件差,覆盖层以O-3t块石为主;风浪条件恶劣,季风期有效波高达5m以上。前期人员、设备、材料等出海的施工码头建设十分困难。通过综合分析比较高桩码头、抛石堤码头及板桩码头等传统码头形式的特点,经科学的设计创新采用无锚板桩+支撑墩结构形式码头,同时采取安全可靠的施工技术,高效、安全地完成施工码头的建设。 The geologic condition of the Hadarom port project to be built is unfavorable, and the site is dominantly covered by rocks of 0 - 3 t. The adverse wave condition has a maximum significant wave height of above 5 m, which causes a great deal of troubles for the offshore construction. The innovative quay design adopts the combination of non-anchor sheet pile and supporting pier based on comprehensive comparisons with traditional high- pile wharf, riprap embankment wharf and sheet pile quay, etc. With safe and reliable construction technique, the construction is completed safely with high efficiency .
出处 《水运工程》 北大核心 2015年第8期27-30,共4页 Port & Waterway Engineering
关键词 施工码头 无锚板桩+支撑墩结构 结构设计 施工技术 construction quay non-anchor sheet pile and supporting pier structure design construction technique
  • 相关文献

参考文献4

二级参考文献4

  • 1雷庆攀,黄达中.新型高桩码头结构型式的探索[J].科技风,2009(16). 被引量:3
  • 2JTJ50-98,港口工程地基规范[S].
  • 3JTJ292—98,板桩码头设计与施工规范[S].
  • 4交通部第—航务工程勘察设计院.港口工程结构设计算例[M].北京:人民交通出版社,1998.

共引文献5

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部