在富春江船闸扩建改造工程风冷系统实际施工过程中,对粗骨料、拌合水、混凝土出机口温度以及浇筑温度进行实时监测,研究风冷骨料及制冷水系统的冷却能力,以指导后期施工。
According to the actual construction process of air cooling system of the Fuchun river lock expansion and improving project, through the real-time monitoring of coarse aggregate, mixing water, the concrete mixer outlet temperature and pouring temperature, this article gives a comprehensive study on the cooling capacity of the air-cooling aggregate and its cooling water system, to provide guidance for the later construction.
出处
《水运工程》
北大核心
2015年第8期63-65,共3页
Port & Waterway Engineering
基金
交通运输部企业技术创新项目(201431542A060)
关键词
风冷系统
船闸
温度应力
浇筑温度
air-cooling system
lock
temperature stress
pouring temperature