摘要
结合湖北亚东专用码头嵌岩斜桩施工,总结采用普通液压回旋钻机进行斜孔嵌岩桩施工的工艺难点及施工过程中所遇问题的处理措施。
Based on the construction of rock-embedded raked pile for Hubei Yadong special wharf, this text summarizes the technical difficulties of rock-embedded raked pile constructed by the common hydraulic swing drill, and puts forward the treatment measures for the difficulties.
出处
《水运工程》
北大核心
2015年第8期161-164,共4页
Port & Waterway Engineering
关键词
嵌岩斜桩
工艺
难点
处理
rock-embedded raked pile
technology
difficulty
treatment