考虑时间延迟的k/N(G)系统视情维修策略优化与仿真 被引量:1

Simulation and optimization of condition-based maintenance strategy for k/N(G) system
下载PDF
导出
摘要 针对传统的视情维修决策模型对时间延迟考虑不足的问题,建立了(m,L)视情维修策略下k/N(G)系统维修优化模型,提出了一种求解模型的数值迭代算法。通过仿真分析,得到了最优的视情维修阈值m和延误时间L,由此证明了该模型与算法的可行性。 Considering the delay time L, an optimal maintenance model for k/N (G) system is estab- lished with the (rn, L) condition-based maintenance strategy. Firstly, the analytical method of the system operational availability and maintenance cost rate is analyzed. Then, a numeric iteration algo- rithm is proposed to obtain the optimal maintenance threshold m and the optimal delay time L. The al- gorithm minimizes the maintenance cost rate under the condition of system availability. A numerical example proves the proposed model and algorithm to be effective and feasible.
作者 尉强 刘忠
出处 《海军工程大学学报》 CAS 北大核心 2015年第4期41-44,49,共5页 Journal of Naval University of Engineering
基金 国家部委基金资助项目(KJ20111196)
关键词 视情维修 冗余系统 修理延迟 使用可用度 维修费用率 condition-based maintenance redundancy system repair delay operational availabilitymaintenance cost rate
  • 相关文献

参考文献11

  • 1FAWZI B B, HAWKES A G. Availability of a R- out-of-N system with spares and repairs [J]. Jour- nal of Applied Probability, 1991,28:397-408.
  • 2FROSTIG E, LEVIKSON B. On the availability of R-out-of-N repairable systems [J]. Naval Research Logistics, 2002,49 (5) : 483-498.
  • 3KRISHNAMOORTHY A, USHAKUMARI P V. k-out-of-n: G system with the D-policy [J]. Com- puter ~ Operations Research, 2001,28:973-981.
  • 4USHAKUMARI P V, KRISHNAMOORTHY A. k-out-of-n: G system with the max(N, T) [J]. Per- formance Evaluation, 2004,57 : 221-234.
  • 5MINJAE P, HOANG P. A generalized block re- placement policy for a k-out-of-n system with re spect to threshold number of failed components and risk costs [J]. IEEE Transactions on Systems, Man, and Cybernetics--Part A: Systems and Hu- mans, 2012,42(2) :453-463.
  • 6DE SMIDT-DESTOMBES K S, VAN DER HEIJ- DEN M C, VAN HARTEN A. On the availability of a k-out-of-N system given limited spares and re- pair capacity under a condition based maintenance strategy [J]. Reliability Engineering and System Safety, 2004,83(3) :287-300.
  • 7DE SMIDT-DESTOMBES K S, VAN DER HEIJ- DEN M C. VAN HARTEN A. On the interaction between maintenance, spare part inventories and re- pair capacity for a k-out-of-n system with wear-out[J]. European Journal of Operational Research, 2006,174(1) : 182-200.
  • 8张涛,张建军,郭波.基于使用可用度的k/N系统(m,N_G)维修策略分析[J].宇航学报,2009,30(1):395-401. 被引量:17
  • 9蔡景,左洪福,吕德峰.AVAILABILITY SIMULATION OF MULTI-COMPONENT SYSTEM BASED ON OPPORTUNISTIC MAINTENANCE POLICY[J].Transactions of Nanjing University of Aeronautics and Astronautics,2009,26(3):219-223. 被引量:5
  • 10ROSS S M. Introduction to Probability Models [M]. 10th Edition. Singapore: Elsevier Press, 2010.

二级参考文献9

  • 1张涛,郭波,武小悦,谭跃进.任意结构系统的备件可用度评估模型[J].航空学报,2005,26(2):203-207. 被引量:16
  • 2Karin S, de Smidt-Destombes, Matthieu C, van der Heijden, Aart van Harten. On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy[J]. Reliability Engineering and System Safety, 2004, 83 : 287 - 300.
  • 3Smith MAJ, Dekker R. Preventive maintenance in a 1-out-of-n system: the uptime, downtime and costs[J]. European Journal of Operations Research, 1997, 99:565 - 83.
  • 4Fawzi BB, Hawkes AG. Availability of an R-out-of-N system with spares and repairs [ J ]. J Application Probability, 1991, 28 : 397 - 408.
  • 5Frostig E, Levikson B. On the availability of R out of N repairable systems[J]. Naval Research Logistics, 2002, 49(5) :483 - 498.
  • 6Karin S, de Smidt-Destombes, Matthieu C, van der Heijden, Aart van Harten. On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out[J]. European Journal of Operational Research, 2006,174:182 - 200.
  • 7Karin S, de Smidt-Destombes, Matthieu C, van der Heijden, Aart van Harten. Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity[J]. Int. J. Production Economics, 2007, 107:404 - 421.
  • 8邓重一.N个不同部件并联可修系统可用度的分析[J].湖南工程学院学报(自然科学版),2003,13(2):25-27. 被引量:8
  • 9Yang Junan Li Bin Zhuang Zhenquan (Department of Electronic Science & Technology, USTC, Hefei 230026).RESEARCH OF QUANTUM GENETIC ALGORITH AND ITS APPLICATION IN BLIND SOURCE SEPARATION[J].Journal of Electronics(China),2003,20(1):62-68. 被引量:60

共引文献19

同被引文献63

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部