龚嘴电站门机自动抓梁改造 被引量:1

Renovation of the Automatic Grabbing Beam of Gantry Crane in Gongzui Hydropower Station
下载PDF
导出
摘要 对龚嘴电站大坝门机自动抓梁运行中在水下不能穿、退销等运行中常见问题,提出了改进意见,并对已有自动抓梁泵站进行改造,提高了设备的可靠性,保障人员设备的安全,并根据实际经验,提出了操作注意事项。 In the operation of the automatic grabbing beam of gantry crane in the connection and disconnection of dowels are frequently encountered. Thus ic grabbing beam are proposed. After the renovation, the reliability of the de ers is ensured. In addition, issues that should be noted in the operation are Gongzui Hydropower Station, difficulties in , several renovation advices on the automat- vice is improved and the safety of the work- presented.
作者 胡强 冯德强
出处 《水电与新能源》 2015年第8期42-43,47,共3页 Hydropower and New Energy
关键词 冲砂底孔 自动抓梁 改造 龚嘴水电站 sediment flushing bottom outlets automatic grabbing beam renovation Gongzui Hydropower Station
  • 相关文献

参考文献2

二级参考文献1

  • 1DL/T5013——95,水力水电工程钢闸门设计规范[S].

共引文献5

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部