摘要 介绍国电大渡河检修安装有限公司面对大渡河铜街子电站12号机组增容改造中人力紧张的状况,以龚电检修项目部为主体,通过内部人力资源整合、项目激励及优化施工进度措施,安全、优质、高效地完成了机组增容改造工作,探索了一条独具大渡河特色的大型水轮发电机组增容改造人力资源保障策略。 In the capacity expansion upgrading of the No. 12 the human resources is encountered. In this situation, some generator unit in Tongjiezi Hydropower Station, shortage of distinctive human resources security strategies are adopted, such as the internal human resources integration, project incentive mechanism, and optimization of the construction schedule. With these strategies, the upgrading work is finished safely, effectively and of high quality.
作者 吴梁继
出处 《水电与新能源》 2015年第8期62-64,共3页 Hydropower and New Energy
关键词 增容改造 人力资源 整合 capacity expansion upgrading human resources integration
  • 相关文献

参考文献4

二级参考文献35

  • 1寿涌毅.多项目资源配置的拉格朗日分解方法[J].数量经济技术经济研究,2004,21(8):98-102. 被引量:13
  • 2杨雪松,胡昊.基于关键链方法的多项目管理[J].工业工程与管理,2005,10(2):48-52. 被引量:63
  • 3郭燕,梁工谦,徐显龙,肖艳.一种判断企业内部项目优先级的定量评价方法[J].航空制造技术,2006,49(5):98-102. 被引量:7
  • 4艾利.高德拉特著.罗嘉颖译.关键链.北京:电子工业出版社,2006.
  • 5Willy Herroelen, Roel Leus. On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 2001,(19):559-577.
  • 6龙颖.基于约束理论的关键链在项目进度管理中的应用研究.长沙:湖南大学,2006.
  • 7HERROELEN W, REYCK B D, DEMEULEMEESTER E. Resource-constrained project scheduling: a survey of recent developments[J]. Computers and Operations Research, 1998, 25(4): 279-302.
  • 8SHTUB Avraham, LEBlANC Larry J, CAI Ziyong. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm[J]. European Journal of Operational Research, 1996, 88(1): 124-138.
  • 9Etgar Ran, SHTUB Avraham, LEBLANC Larry J. Scheduling projects to maximize net present value-the case of time-dependent, contingent cash flows[J]. European Journal of Operational Research, 1997, 96(1): 90-96.
  • 10AHN Taeho, ERENGUC S Selcuk. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure[J]. European Journal of Operational Research, 1998, 107(2): 250-259.

共引文献26

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部