摘要
针对水电站的"三漏"(漏油、漏气、漏水)问题,结合瀑布沟水电站常见渗漏缺陷现象,从密封材料、密封结构、安装工艺及技术管理等方面论述了"查、定、重、改、换、堵、控、严、接、建、细"的治理方式,实施效果良好。
From the aspects of seal vention and treatment measures for materials, seal structures, installation technology and technology management, pre- the "three leakage problems" (i. e. , oil leakage, gas leakage and water leakage) that are commonly found in Pubugou Hydropower Station are introduced. These measures can be defined as: examina- tion, determination, reworking, renovation, replacing, blocking, controlling, strictness, connection, construction and carefulness. Satisfactory results are obtained with these measures in practice.
出处
《水电与新能源》
2015年第8期75-78,共4页
Hydropower and New Energy
关键词
水电站
三漏
密封
防与治
hydropower station
three leakage problems
seal
prevention and treatment