摘要 本文结合南水北调配套续建工程贾庄至卧虎山水库输水工程,对长直管段钢管在安装阶段和打压阶段存在的问题进行了分析,介绍了在安装过程中针对长直管段增加橡胶伸缩器、在管道打压试验准备阶段对管道进行预埋等做法。 In the paper, supporting extension work in South-to-North Water Diversion Project--Water Diversion Project from Jiazhuang to Wohushan Reservoir is combined for analyzing problems of long straight steel pipe in installation stage and pressing stage. Methods in the installation process are introduced, such as adding rubber compensator in long straight pipe section and embedding pipeline in pipeline pressing test preparation stage.
出处 《水利建设与管理》 2015年第8期44-47,共4页 Water Conservancy Construction and Management
关键词 输水钢管 屈曲 失稳 解决方法 water diversion steel pipe bending instability solution
  • 相关文献

参考文献3

  • 1城市建设研究院,北京市煤气热力工程设计院有限公司.CJJ/T81-2013城镇供热直埋热水管道技术规程[S].北京:中国建筑工业出版社,2013.
  • 2European Committee for Standardization. EN13941 : 2009 De- sign and installation of preinsulated bonded pipe-systems for district beating [S].
  • 3顾顺符,潘秉勤.管道安装工程手册[M].北京:中国建筑工业出版社.1987.

共引文献2

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部