本文结合南水北调配套续建工程贾庄至卧虎山水库输水工程,对长直管段钢管在安装阶段和打压阶段存在的问题进行了分析,介绍了在安装过程中针对长直管段增加橡胶伸缩器、在管道打压试验准备阶段对管道进行预埋等做法。
In the paper, supporting extension work in South-to-North Water Diversion Project--Water Diversion Project from Jiazhuang to Wohushan Reservoir is combined for analyzing problems of long straight steel pipe in installation stage and pressing stage. Methods in the installation process are introduced, such as adding rubber compensator in long straight pipe section and embedding pipeline in pipeline pressing test preparation stage.
出处
《水利建设与管理》
2015年第8期44-47,共4页
Water Conservancy Construction and Management
关键词
输水钢管
屈曲
失稳
解决方法
water diversion steel pipe
bending
instability