摘要
以河曲县综合馆为依托,从作业条件、准备工作、吊装工艺、钢梁现场焊接等方面分析了大跨度钢梁安装的施工技术,并阐述了施工中的重难点,提出了一些解决措施,以保证工程的施工质量。
Based on the comprehensive stadium of Hequ County,the paper analyzes the construction technique of the large-span steel beam installation from the construction conditions,preparation,hoisting craft,and welding at steel beam site,illustrates the main difficulties in the construction,and points out some solutions,so as to ensure the construction quality of the project.
出处
《山西建筑》
2015年第27期95-96,共2页
Shanxi Architecture
关键词
钢梁
安装
结构
焊接
steel beam
installation
structure
welding