摘要
建设工程监理单位要着重做好原材料质量控制工作,在施工期间,严格按规定做好见证取样工作,从源头上做好质量控制第一关。只有监理单位认真贯彻落实每一步的要求,才能从根本上控制建设材料质量。
Construction project supervision unit should focus on to do a good job of raw material quality control, During construction, witness samples strictly in accordance with provision, do the first level quality control from the source. Only the supervision unit to seriously implement the every step of the requirements,to fundamentally control the quality of construction materials.
出处
《山东煤炭科技》
2015年第9期198-200,共3页
Shandong Coal Science and Technology
关键词
监理单位
建设材料
质量控制
supervising unit
construction materials
quality control